North Taxiway Paving
During the summer of 2006, the North Hangar
taxiways were graded and paved. These taxiways had been reduced to
gravel by time, and had presented a hazard to every airport user.
Their reconstruction was long overdue, and most welcome.
Click a thumbnail to view a larger picture:
|